This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
me:diary:september:start [2016/09/18 12:47] Christian Ziruk |
me:diary:september:start [2016/09/18 13:05] (current) Christian Ziruk |
||
|---|---|---|---|
| Line 20: | Line 20: | ||
| * Thursdays at 6:00 based on doodle poll? | * Thursdays at 6:00 based on doodle poll? | ||
| - | ** Reflection** | + | |
| ===September 18th 2016=== | ===September 18th 2016=== | ||
| + | |||
| + | ** 19 DAYS UNTIL END OF 1st SPRINT** | ||
| + | |||
| + | Goals/ Discussion | ||
| + | |||
| + | * Project Documents | ||
| + | * Create in word and place into Grab Cad folder | ||
| + | * Tutorial Desicion | ||
| + | * Drawings | ||
| + | * Laser Cutter + Solidworks Configurations | ||
| + | * 3D printing (STL and how to design for the printer) | ||
| + | * FIZ | ||
| + | * Tests for equipment | ||
| + | * Access to Desktop Fabrication room | ||
| + | * Project Requirement Meeting Time | ||
| + | * Set meeting time with corresponding electrical team member about project details and requirements (MUST happen before design phase) | ||
| + | |||
| + | |||
| + | |||
| | | ||